phlegm but for the most part that cold I had last week is almost gone but never say never right?
The other day ETS went and fired their top manager over all the recent delays over the opening of the Metro line. Metro was supposed to be in full operation a year ago but ETS hired Thales to modernize its signaling system. The original system was put together by General Electric. Thales had to merge the old technology from 1978 with the new technology and that's why there had been so many delays. ETS's last manager had over 30 years of experience in transit so he ended up being the scape goat in all of this. ETS says the Metro line will be opened when its reliable enough. Translation: When the City can have a staged opening and the Mayor can make his speech with the Province, Feds and ETS partners as a backdrop. In the meantime the testing of cars along Metro and Capital lines is continuing, stay tuned.
Anne's getting up in about half an hour and wants to go over to Wendy's for me before she heads to work. Great. Then I can get cleaned up and leave out of here for Lodge.
No comments:
Post a Comment